Michael Collins Irish Bar - Barcelona

Global Media Tech Spain SL were tasked to install Hi Quality Video Monitors that were discrete when not in use, and provide high quality images when the need arose. We were also tasked with putting an Extra Large display above a false fireplace. 

Companies that had been asked to provide the above could only come up with the following solutions. 3 x 32 LCD Displays + Impossible to fit a 60” Display above the fireplace as the wall was not strong enough. Plus in 4 months nothing had actually happened. 

GMT solution conceived and executed in 10 days! 3 x 42 Plasma Displays on cantilever wall brackets (when not in use fit flush against the wall) and a 65” Plasma Display suspended from the ceiling above the fireplace. Upgrade ALL video sources to Component Video capable of Hi Def 1080p Resolution. Install a Kramer Video Matrix. Improve the sound system cabling, move loudspeakers to correct imaging problems for Live Music. Install Component Video Cabling to all Displays. Install New Equipment Racks to aid cooling and Ventilation, and give better manoeuvrability for Staff behind Bar. 

End result, one delighted client 500 customers a night satisfaction, and all completed on time. GMT attended the inaugural night, which coincided with Michael Collins 10th anniversary celebrations. Result. This is not just any install, this is a GMT install. Just Priceless!

You need to have the flash plugin installed to be able to see this gallery.